Need a Tank Removal? Call Walden!
Walden Environmental Engineering performed oversight of the removal of two underground storage tanks. UST Removal and Spill Remediation UST...
Have You Taken Steps to Comply with NYSDEC’s Part 360 Registration Requirements? 5 Things You Need to Know
The New York State Department of Environmental Conservation (NYSDEC) released the new 6 NYCRR Part 360 solid waste management regulations around...
Walden Does Monitoring Well Installation for Groundwater Sampling
Monitoring Well Installation for Groundwater Sampling Groundwater Sampling Long-Term Groundwater Monitoring Phase II Environmental Site Assessments...
Update on General Permit for Bulkhead Replacement on Long Island
Stabilized Shorelines: Bulkhead Update in Long Island Current General Permits for Bulkheads Bulkheads are essential components of infrastructure in...
Above Ground Storage Tanks vs Underground Storage Tanks
Petroleum and Chemical Bulk Storage Decisions If you plan to store petroleum products or certain types of hazardous substances, you can count on...
Watch Walden’s Tank Removal Video!
Walden Environmental Engineering teamed with AARCO Environmental Services to successfully remove two underground storage tanks for our client. UST...
UPDATE: DEC Releases New Comprehensive Strategy Impacting Composting and Mulching Operations
With regards to the risk of groundwater pollution, the New York State Department of Environmental Conservation (NYSDEC) has updated their Part 360...
How Does Walden Use Drones to Monitor and Manage Sites?
Using Drones to Monitor and Manage Your Solid Waste Sites Walden Environmental Engineering has been taking advantage of drone technology in the...
MULCH NOW REGULATED UNDER PART 361
Did you know that as part of new Part 361 regulations, if you require a: Registration; you must have submitted the application by May 4, 2018....
Need a Tank Removal or Need to Close an Active Spill?
UST Removal and Spill Remediation UST management, inspections and troubleshooting Compliance with petroleum storage requirements including...