New York City Department of Sanitation (DSNY) is proposing to revise the rules to require certain buildings to submit a “Building Waste Management Plan.”
Owners and/or managing agents of certain new or altered residential multiple dwellings.
The WMP must include some basic information about the contacts and the size of the property as well as more technical information such as sanitary storage plans for certain types of waste, separation and collection procedures, compliance confirmation and DSNY collection data.
Submitted building waste management plan has to include design drawings that are submitted to the DOB.
Title 16 of the Rules of the City of New York.
Building waste management plan must be submitted to the Department no later than when plans that include design drawings are submitted to the Department of Buildings or the effective date of this rule, whichever is later.
An online public hearing will be held by DSNY from 9:30 am to 11:00 am on May 28, 2020.
To speak at the hearing, you must sign up to speak by calling 646-885-4786 or emailing at mliguori@dsny.nyc.gov by May 27, 2020 at 5:00 pm.
To participate in the public hearing:
If prompted to provide a password or number, please enter the following;
Meeting Number: 796 986 685
Password: 12345! (123450 from phones and video systems)
Phone: (408) 418-9388
Access code: 796 986 685
Password (if requested): 123450 from phones and video systems.
Other ways to submit comments on the proposed rules:
If you have any questions or for more information, please contact Walden Environmental Engineering.
Comments